Monday, 9 May 2011

One two three lift

One of the more tedious tasks when doing external work is the erecting and moving of scaffolding. In an attempt to speed the job up we quite often use lightweight quickfit towers as they are much easier to put up and down.This morning though in a great example of Monday morning laziness we didn't even bother to dissemble one of the towers and just picked it up and carried it instead. The thing about Monday laziness is that it usually comes with an added dose of stupidity as can be seen in picture as we try to avoid the much lower power line....lazy and stupid, a winning combo!

6 comments:

Affer said...

Seeing things like this makes me feel SO much better about my work practices!

monkey said...

its good practice, shocks the lads in to work just what you need for a monday

Sen. C.R.O'Blene said...

I used to have a plastic model of that kit when it first came out...

Thud said...

scrobs...did it contain scouse action figures?

Electro-Kevin said...

Did the same with a fully extended ladder the other day.

Flipped right over me and I ended up with my head between two rungs. Luckily the incline behind me stopped it or else I would have broken my neck.

(WV: pensi)

James Higham said...

Not into the tubular steel then?